Eric Gideon's aeronaut.ca

Go to content Go to navigation

Instrument Proficiency Check plan of action

This plan of action, while generic, meets the requirements of the Instrument Practical Test Standards.

Logbook endorsement

I certify that full name, certificate & number, has satisfactorily completed the instrument proficiency check of §61.57(d) in a make and model on date.

Date, signature, CFI #, exp date

Ground
  1. FAR Part 91 review
    • Subpart B (instrument flight rules)
    • Subpart C (equipment, instrument, and certificate requirements)
    • Subpart E (maintenance)
  2. Instrument enroute and approach charts
    • SID/DPs
    • STARs
  3. Weather analysis and knowledge
  4. Preflight planning
    • performance data and fuel planning
    • alternates
    • publications and NOTAMS
  5. Aircraft systems related to IFR operations
  6. Aircraft flight instruments and navigation equipment
    • technologically advanced aircraft
    • oxygen and anti- or de-icing equipment
  7. Airworthiness status of aircraft and avionics related to IFR flight
  8. Other areas, as appropriate
Flight
  1. Recovery from unusual flight attitudes
  2. VOR/DME approach (nonprecision)
    • Intercepting/tracking navaids and DME arcs
    • Missed approach
  3. Approach with loss of primary flight instruments (on final)
    • Circle to land
    • Missed approach
    • Holding
  4. Emergency operations
  5. ILS (precision)
    • Landing from a straight-in approach
  6. Postflight procedures

all this © 2007 { x + c } feed